Industrial · Lahore, Pakistan · 2022

Batala Steel Mills

Explore the 200kW hybrid solar power project associated with Batala Steel Mills, featuring a solar energy system designed for industrial power needs.

  • 450KW Installed Capacity
  • 76% Cut in Grid Dependency
  • 60 Days Installation Time
  • 377 metric tons CO₂ Offset

Technical Specifications

System Capacity450KW
Solar PanelsLongi HiMo X10 650W
Estimated Annual Generation547500kW
CO₂ Reduction (per year)377 metric tons