Industrial · Lahore, Pakistan · 2022

Batala Steel Mills

  • 450KW Installed Capacity
  • 76% Cut in Grid Dependency
  • 60 Days Installation Time
  • 377 metric tons CO₂ Offset

Technical Specifications

System Capacity 450KW
Solar Panels Longi HiMo X10 650W
Estimated Annual Generation 547500kW
CO₂ Reduction (per year) 377 metric tons
A black desk telephone beside an older dial telephone

Discuss your power requirements with our engineers

Tell us about the site, the load and the outcome you need. We will come back with a recommendation and a quotation, and an engineer can visit the site to check the roof or open space, the shading and the electrical connection before the design is fixed.